As viewed with the determine underneath, ongoing auger is used to drill the borehole, raise up drilled soil, and pour concrete while the auger is moved up. As a result, the borehole isn't going to need to have casing or hydrostatic tension to stop harm to the borehole wall.Hook up a hopper to the top of tremie pipe. After that, shut the joint betwe